01Overview
Most setup problems come from decisions made in the wrong order: buying machines before choosing products, or leasing a building before checking height and power.
We work in the order that avoids rework.
02Who This Service Is For
- First-time paint manufacturers
- Dry mix or chemical makers adding paint
- Existing small plants expanding range
- Entrepreneurs preparing a project report for a loan
03What We Do
| Work area | What is covered | You receive |
|---|---|---|
| Product plan | Which paints and sizes to launch | Product list and phase plan |
| Capacity and layout | Batch size, flow and area | Layout drawing and area estimate |
| Machinery | Machine list and specifications | Specification sheet for quotations |
| Utilities | Power, water, air, effluent | Utility checklist |
| Laboratory | Tests and instruments | Lab plan |
| Commissioning | Trials and training | Start-up support plan |
04How the Work Runs
- Discovery callProducts, budget, location, timeline.
- Data collectionYour inputs and market view.
- Technical workCalculations, drawings, formulas as scoped.
- ReviewWalk through findings and revise.
- HandoverReports, drawings and next steps.
05What We Need From You
- Products you want to make
- Target capacity and market
- Site details or building plan
- Budget range
- Existing machinery if any
06Typical Deliverables
- Plant plan document
- Layout drawing
- Machinery specification
- Utility and laboratory checklist
- Phase plan and timeline
07Mistakes This Service Helps You Avoid
| Mistake | Why it hurts | How we avoid it |
|---|---|---|
| Buying machines first | Wrong size and layout | Products and capacity decided first |
| Ignoring building height | Gravity layout impossible | Site check early |
| Skipping lab | Quality issues in market | Lab planned with plant |
| Underestimating working capital | Plant stalls | Working capital included in plan |
08Scope & Limits
Outputs are technical planning documents. Statutory approvals, licences, bank decisions and market outcomes remain your responsibility.
Cost and capacity figures are estimates until supplier quotations are received.
09Why IPCS
- Technical team focused on paint, dry mix and construction chemicals
- Plain-language reports you can use with banks, partners and suppliers
- No dependence on one machine supplier
- Honest feasibility, including when a plan should change
10Frequently Asked Questions
How long does setup take?
Planning takes weeks; building and installation depend on your site and suppliers.
What area do I need?
Depends on products and capacity; see space requirements.
Do you supply machines?
IPCS guides selection and quotations; scope is stated in writing.
Can you help with licences?
We provide a checklist; applications are yours.
What does it cost?
See plant cost guide and request a quote.