01Quick Answer
There is no single correct area. Tell us your products and capacity and we can estimate.
02Zones to Plan
| Zone | Purpose | Note |
|---|---|---|
| Production hall | Dispersion, milling, let-down | Clear height for platforms |
| Raw material store | Powders, resins, additives | Dry and segregated |
| Solvent store | Flammables | Separate with fire norms |
| Finished goods | Packed paint | Pallet racks |
| Filling and packing | Filling and labels | Near despatch |
| Laboratory | QC | Quiet and clean |
| Utilities | Compressor, pumps, tanks | Noise isolation |
| Office and staff | Admin and amenities | Separate from production |
03Building Height
A platform for a disperser above tanks needs extra height. Check clear height under beams before you rent or build.
04Floor and Access
- Strong, level floor
- Drains and spill containment
- Wide doors and forklift routes
- Truck loading area
05Growth
Leave space and utility capacity for a second mill or filler line.
06Next Step
Send us your product list for a space estimate and a first layout.
07Frequently Asked Questions
What is the minimum area?
Small plants can start in a few hundred square metres; confirm with a layout.
Is a rented shed fine?
Yes if height, power and rules allow.
Why is height important?
For platforms and gravity flow.
Do I need a separate lab room?
Yes.
How much storage?
Plan days of stock for each material.
