01Quick Answer
Prices change with brand, capacity, automation and location. Treat any figure as a planning range and confirm with written quotations.
02Cost Components
| Item | Includes | Driver |
|---|---|---|
| Mixer | Ribbon or paddle | Batch size and type |
| Handling | Screw conveyor, elevator, hoppers | Automation |
| Packing | Manual, valve or open-mouth | Output |
| Dust control | Collector and ducts | Capacity |
| Sand preparation | Dryer, screen | Sand moisture |
| Building | Shed and storage | Area and height |
| Laboratory | Basic tests | Class claims |
| Working capital | Cement, sand, polymers, bags | Sales cycle |
03Phasing
Start with a mixer, manual feeding and bagging. Add a dryer, silo and packer as volume grows. See dry mix plant machinery.
04Working Capital
Polymers and cellulose ether are costly. Include them in your working capital plan.
05Control
- Get itemised quotations
- Compare scope, not just price
- Include dust control and testing
06Next Step
Share your target output for an itemised outline.
07Frequently Asked Questions
What is the cheapest start?
A mixer with manual feed and bagging.
Do I need a silo?
Not at the start.
What about testing?
Class claims need test data.
Can I make putty on the same plant?
Yes.
Where is the profit?
In controlled cost and consistent quality.
